Logements domaniaux — les livraisons

All records — Redevelopment & conversion

Major Principality state-housing schemes, dated by official delivery notices published in the Journal de Monaco: from Agaves in 2004 to Testimonio II programmes in 2022–2023.

Author of noticesDirection de l'Habitat
Publication channelJournal de Monaco, « Avis et Communiqués — Locaux vacants » section
SubjectState-owned flats offered for rent by the State
First delivery recorded30 April 2004 — Agaves phase C, Les Terrasses du Port
Schemes identifiedAgaves, Terrasses du Port, Testimonio, Aureglia-Grimaldi, Athéna, Jardins d'Apolline, Îlot Canton-Les Tamaris, Tour Odéon, Testimonio II
AddressDivers quartiers de la Principauté, 98000 Monaco
DistrictMonaco
Checked on6 October 2026

This record documents a whole strand of Monegasque built heritage — state housing, flats built or managed by the State for rent — and rests on an unexpected source: small administrative ads.

Each time a scheme is delivered, the Direction de l’Habitat publishes in the Journal de Monaco, « Locaux vacants » section, a notice that flats are available to rent. These notices — eleven were collected — are the only dated public trace of commissioning and allow a continuous chronology:

Year Delivered scheme
2004 Agaves phase C, Les Terrasses du Port
2006 Testimonio
2007 Aureglia-Grimaldi
2009 Athéna
2012 Jardins d’Apolline (2nd phase)
2013 Îlot Canton – Les Tamaris
2014 Tour Odéon
2022–2023 Testimonio II, Testimonio II bis, Ida-Carmelha

Why these notices matter as archives

A housing scheme has no public « completion date »: the first stone is known from a release, rarely key handover. Here, handover is the notice: as soon as the State offers the flats, the scheme is delivered.

Tour Odéon illustrates this: the Principality’s tallest tower enters this archive through a September 2014 administrative notice, not press coverage. That is what Memoria seeks — the document that dates, rather than the story that celebrates.

A methodological caveat

Memoria publishes no personal data: no name, status or nationality of applicants, even though Monegasque nationality appears in the notices. Only the administrative fact — the scheme’s existence and delivery date — is kept.

The facts are paraphrased; only the source is cited. A correction, a missing date? Write to Memoria.

The complete history, archive by archive

4 archives

2022

CompletionJournal de Monaco — avis de la Direction de l'Habitat, 2022-2023· 1 January 2022

Testimonio II and Ida-Carmelha programmes

Official delivery notices published between 2022 and 2023 confirm commissioning of Testimonio II, Testimonio II bis and Ida-Carmelha. For each state-housing operation, these notices are the only dated public trace of commissioning.

Memoria archive — source cited above

2014

CompletionJournal de Monaco — avis de la Direction de l'Habitat, 5 septembre 2014· 5 September 2014

Tour Odéon

A state-housing delivery notice dated 5 September 2014 lists Tour Odéon among delivered schemes. The Principality's tallest tower enters the archive through an administrative document, not a press article.

Memoria archive — source cited above

2012

CompletionJournal de Monaco n° 8.089 — 5 octobre 2012· 5 October 2012

Les Jardins d'Apolline, second phase

The Direction de l'Habitat informs applicants for state-housing rental that the « Les Jardins d'Apolline, 2ème partie » scheme is delivered, along with other available units. The notice is published twice in October 2012.

Read the cited source →

2004

CompletionJournal de Monaco n° 7.649 — 30 avril 2004· 30 April 2004

Agaves phase C and Les Terrasses du Port

First delivery recorded by Memoria: the Direction de l'Habitat announces rental of state-owned flats for « Agaves Tranche C », « Les Terrasses du Port » — later « Immeuble, 48, boulevard d'Italie » — and recovery units. The notice runs over several consecutive Journal issues.

Read the cited source →
Sources & press coverage

Sources cited in Logements domaniaux — les livraisons's timeline

Memoria paraphrases facts from these publications and links to their publishers. Titles and links remain the property of their authors; no article content is reproduced.

Related records

Redevelopment & conversionMonte-Carlo

One Monte-Carlo

District of shops, residences and public spaces built on the site of Sporting d'Hiver, the first stone of which was laid on July 5, 2016.

3 archives · 2009 → 2019✓ Verified
Redevelopment & conversionMonte-Carlo

Gare souterraine et tunnel ferroviaire de Monaco

Burial of the railway line and construction of the underground station, declared of public utility by Law No. 1.143 of 26 July 1991: the operation that returned surface land to Monaco.

2 archives · 1991 → 2026✓ Verified
Redevelopment & conversionMonte-Carlo

Halles et Marchés de Monte-Carlo

Halles et Marchés de Monte-Carlo building, whose demolition and reconstruction were declared of public utility by Law No. 1.076 of 27 June 1984.

1 archive · 1984✓ Verified
Major facilitiesMonaco

Stade Nautique Rainier III

Swimming pool and nautical stadium inaugurated on August 19, 1961 by Prince Rainier III and Princess Grace, on the Quai Albert I.

1 archive · 1961✓ Verified
Major facilitiesLa Condamine

Marché de la Condamine

Place d'Armes food hall — opening traditionally located in 1880, major restructuring since January 15, 2026 (13 months, traders on the square).

3 archives · 1880 → 2026✓ Verified
Land reclamationExtension sur mer

Mareterra

The eleventh expansion of Monaco on the sea: six hectares reclaimed from the Mediterranean between the Grimaldi Forum and Anse du Portier, inaugurated on December 4, 2024 after eight years of construction.

13 archives · 2013 → 2025✓ Verified