Home·Buildings·Land reclamation·Mareterra

Land reclamationExtension sur mer✓ Verified archive

Mareterra

The eleventh expansion of Monaco on the sea: six hectares reclaimed from the Mediterranean between the Grimaldi Forum and Anse du Portier, inaugurated on December 4, 2024 after eight years of construction.

InaugurationDecember 4, 2024, by the Princely Family
Surface6 hectares, or +3% of the territory (208 hectares)
Cost2 billion euros, financed by private funds
Construction site8 years · more than 300 companies · 6,000 people
DesignRenzo Piano (RPBW) and Valode & Pistre, associated with Tadao Ando and Norman Foster
LandscapeMichel Desvigne Landscaper
Public spacesNearly 3 hectares · one hectare park · 500 meter walk
Program120 apartments, 10 villas, shops, restaurants, port of 16 rings
Energy80% of heating and cooling covered by renewables
Biodiversity510 m² of Posidonia herbaria saved before the work
StatusDistrict open to the public, public spaces with free access
Dealer assemblyGroupement Bouygues TP and Le Portier Holding S.C.A. — company “l’Anse du Portier” (Journal, LégiMonaco)
AddressEntre le Grimaldi Forum et l'anse du Portier, 98000 Monaco
Opening hoursPublic district · public spaces and promenade with free access
DistrictExtension sur mer
Checked on6 October 2026

Mareterra is the eleventh expansion of the Principality on the sea, and the first completely new district built on the Mediterranean. Between the Grimaldi Forum and Anse du Portier, six hectares have been reclaimed from the sea – approximately 3% of Monegasque territory, which increases to 208 hectares.

From a bill to a district

The story begins with a text: in 2015, the bill pronouncing the decommissioning of plots and volumes to the right of Anse du Portier was tabled and then debated at the National Council. The concession agreement of July 30, 2015 entrusts design, financing and marketing to the Groupement de l’Anse du Portier (Bouygues Travaux Publics and Le Portier Holding S.C.A.), materialized by the company “l’Anse du Portier” - the homonymous SCA published in the Journal in 2016 mentions Patrice Pastor among the people likely to control the project vehicle (file Patrice Pastor →). The project will take eight full years, mobilizing more than 300 companies and 6,000 people, until delivery in 2024, six months ahead of the initial schedule.

The feat is first and foremost maritime. Between September 2018 and July 2019, eighteen reinforced concrete boxes are assembled to form a belt which delimits the future district. Each is brought in to the nearest centimeter by multi-cat ships, then ballasted with sand until it reaches around 24,000 tonnes. This belt is not just a sea wall: the waves hit damping chambers, which limits their energy before they reach the new coastline.

A public district as much as a residential one

Contrary to the image of a private district, Mareterra reserves a large part of its land for the public: nearly three hectares of public spaces, a one-hectare park, a 500-meter seaside promenade, 19,000 m² of pedestrian zone and 600 meters of cycle path. The built program includes 120 very high standard apartments, 10 villas, shops, restaurants and a 16-ring marina.

The design associates Renzo Piano (RPBW) and Valode & Pistre, to which are added Tadao Ando and Norman Foster for several buildings and villas, with the landscaper Michel Desvigne. The district bears the names of the princely family: Princess Charlene swimming pool, Princess Gabriella square, Prince Jacques esplanade and promenade.

Environmental performance, and its controversy

Mareterra is presented as an eco-district: 9,000 m² of solar panels, 80% of heating and cooling covered by renewable energies, geothermal heating with sea water, 50% reuse of rainwater, 200 electric charging systems, BREEAM, HQE, BiodiverCity and Port Propre certifications. In terms of the marine environment, 510 m² of Posidonia meadows were saved before the work, artificial reefs were installed to encourage the colonization of the new coastline and a “Blue Cave” allows underwater life to be observed.

This environmental communication is also what divides. In April 2025, an international press review shows two opposing stories: headlines hail a “sustainable construction model in the marine environment” and an engineering feat – structure going down to 50 meters deep, strict seismic standards – while others denounce a “Dubaiization” of the Mediterranean and “irremediably lost” biodiversity. Memoria records both, dated and sourced.

A neighborhood that spills over into its neighborhood

Mareterra didn’t just add soil: it redesigned the neighboring neighborhood. The extension of the Grimaldi Forum, developed within the scope of the operation, will come into service in December 2024 and January 2025: an additional 10,000 m², including 6,000 m² that can be marketed, an exterior square of 2,000 m² and three new spaces — Pinède hall, patio, Diaghilev gallery. The establishment increases from 35,000 to 41,000 m² for its 25th anniversary. A year later, the promenade connects Mareterra to Larvotto, whose beach itself was renovated in 2021.

Why we archive it

A new neighborhood has no spontaneous memory: no one remembers what was there before, because there was nothing there - except the sea. This is precisely the role of Memoria: to keep track of the construction site, the decisions and the controversies so that, in thirty years, we can still say how Monaco gained these six hectares, at what cost, and with what effects on the marine environment.

All Mareterra archives are dated and linked to a public source. The facts are paraphrased; only titles, media, dates and links to publishers are included, with their mention. A correction, a document, a testimony? Write to Memoria.

The complete history, archive by archive

13 archives

2025

Practical informationNice-Matin — décembre 2025 ; Petites Affiches — décembre 2025· 4 December 2025

One year later, the neighborhood has found its place

First assessment, one year after the inauguration: public spaces adopted, shops and restaurants open, promenade which extends that of Larvotto, neighborhood life established. The international press continues to be interested in the model, between an engineering feat and environmental issues.

Read the cited source →
PressMonaco Tribune — 20 avril 2025 (revue de presse)· 20 April 2025

The international press is divided on Mareterra

Press review: the district is presented as the most expensive in the world, with a price per square meter exceeding 100,000 euros, and praised for its engineering - structure descending up to 50 meters deep, strict seismic standards. Other titles speak of “Dubaiization” and contest the scope of environmental commitments.

Read the cited source →
CompletionNice-Matin — janvier 2025· 16 January 2025

The Grimaldi Forum opens its extension on Mareterra

The Grimaldi Forum teams take possession of the extension on December 20, 2024; Prince Albert II and Princess Charlene will discover the new spaces in January 2025, the year of the building's 25th anniversary. Ten years of work produced an additional 10,000 m², including 6,000 m² of marketable space, an exterior square of 2,000 m² called “Parvis Émeraude”, a Pinède hall, a patio and a Diaghilev gallery. The establishment increases from 35,000 to 41,000 m².

Read the cited source →

2024

InaugurationMonaco Tribune — 5 décembre 2024 ; Direction de la Communication· 4 December 2024

The Princely Family inaugurates the eco-district

On Wednesday, December 4, Prince Albert II, Princess Charlene, Hereditary Prince Jacques and Princess Gabriella inaugurated Mareterra, in the presence of members of the Government. In his speech, the Sovereign presents the extension as “a symbol” embodying “a Principality which dares, which embraces audacity, but which controls its destiny with wisdom and knows how to listen to the environment”. The day ends with a drone show and fireworks.

Read the cited source →
CompletionMonaco Tribune — 5 décembre 2024 ; Mareterra — maître d'ouvrage· 1 June 2024

End of work: six hectares and eight years of construction

Eight years of work will have mobilized more than 300 companies and 6,000 people, day and night, to deliver the neighborhood six months ahead of the initial schedule. Monaco increases to 208 hectares in area. The program includes 120 high-end apartments, 10 villas, shops, restaurants, a 16-ring marina, nearly three hectares of public spaces including a one-hectare park and a 500-meter seaside promenade.

Read the cited source →
EnvironmentMareterra — maître d'ouvrage ; Monaco Tribune — 5 décembre 2024· 4 December 2024

Blue Cave and measures for biodiversity

The district includes the “Blue Grotto”, a space allowing you to observe underwater life. Biologists and experts supported the project: safeguarding 510 m² of Posidonia meadows, controlling the caulerpa, artificial reefs promoting the colonization of the new coastline, bird nests and insect hotels. The project is designed to anticipate a one-meter rise in sea levels within a century.

Read the cited source →

2023

ConstructionMonaco Tribune — novembre 2023 ; Nice-Matin· 1 November 2023

Delivery announced six months in advance

As the construction site enters its final phase, delivery of Mareterra is announced for 2024, six months ahead of the initial schedule. Prince Albert II publicly discusses the imminent delivery of the offshore extension among the Principality's major projects.

Read the cited source →

2019

ConstructionMareterra — Anse du Portier, maître d'ouvrage· 1 July 2019

The belt of eighteen caissons closed

The assembly of the eighteen reinforced concrete boxes, started in September 2018, was completed in July 2019: the belt demarcates the future Anse du Portier district. Each box, installed to the nearest centimeter using multicats and six hydraulic winches, weighs approximately 24,000 tonnes after ballast with sand. They serve as a shield against the swell, absorbed in damping chambers.

Read the cited source →

2016

RegulationJournal de Monaco n° 8.285 — 8 juillet 2016· 4 July 2016

Law No. 1.427 decommissions plots in the public domain

Law No. 1.427 of July 4, 2016 pronounces the decommissioning of plots and volumes of public domain identified under numbers 1 to 16 in plot plan No. C-2015-0943 of July 4, 2015, on the new area to be created to the right of Anse du Portier, Larvotto district. It also authorizes the State to transfer this land to third parties. The text was adopted by the National Council on June 28, 2016, after report and vote in public session. This is the founding act of the project. Memoria reports that a first bill, No. 941 tabled in 2015, was withdrawn by mutual agreement and replaced by No. 948: a withdrawn text cannot be presented as founding.

Read the cited source →
ConstructionLégiMonaco — projet de loi n° 948, exposé des motifs· 4 July 2016

The concession treaty signed on July 30, 2015 comes into force

The offshore extension concession treaty was signed by the Minister of State on July 30, 2015. Its implementation was subject to two suspensive conditions — a sovereign amending order and the decommissioning law — to be lifted within twelve months. Law No. 1.427 of July 4, 2016 lifts the second.

Read the cited source →

2015

DevelopmentLégiMonaco — projets de loi n° 941 puis n° 948· 4 September 2015

The offshore urbanization project enters into Monegasque law

Bill No. 941 pronouncing the decommissioning of plots and volumes in a new area to be created to the right of Anse du Portier was tabled in 2015. Memoria reports this with its sequel: this text was withdrawn by mutual agreement and replaced by Bill No. 948, adopted in 2016, which became Law No. 1.427.

Read the cited source →

2014

FoundationJournal de Monaco n° 8.181 — 2014· 3 July 2014

Creation of the company “L’Anse du Portier”

A ministerial decree of July 3, 2014 authorizes and approves the statutes of the Monegasque limited company called “L'Anse du Portier”, with capital of 150,000 euros. The company is the legal entity that will carry out the offshore expansion operation.

Memoria archive — source cited above

2013

ConstructionJournal de Monaco n° 8.129 — 12 juillet 2013· 12 July 2013

The call for competition for an offshore extension

A notice of public call for competition was published on May 3, 2013 for the design, construction and marketing of an offshore extension, then the consultation regulations specify the program data: approximately 6 hectares, 60,000 m² salable, one billion euros of infrastructure, extension of the Larvotto and respect for the Larvotto reserve and the Spélugues drop-off. The regulation states that “the Sovereign Prince graciously relinquishes his rights to the seabed.”

Read the cited source →
Sources & press coverage

Sources cited in Mareterra's timeline

Memoria paraphrases facts from these publications and links to their publishers. Titles and links remain the property of their authors; no article content is reproduced.