Home·Places & Heritage·Beaches & Gardens·Plage du Larvotto

Beaches & GardensLarvotto✓ Verified archive

Plage du Larvotto

The historic public beach of the Principality — built in the 1960s, renovated in 2021, and whose 2003 dykes give way to three islets of rock.

Original layout1960s, on the Larvotto peninsula
Seaside renovation2019–2022, architect Renzo Piano
ReopeningJuly 3, 2021
Shoreline protectionGeotubes from 2003 → 3 rock islands (2025–2026)
ManagementPublic Works Department · Environment Department
AccessPublic · Handicap for people with reduced mobility
AddressAvenue Princesse Grace, 98000 Monaco
Opening hoursPublic beach · supervised in season
DistrictLarvotto
Checked on6 October 2026

Larvotto beach is the historic public beach of the Principality, on Avenue Princesse Grace. Several hundred meters long, it concentrates most of Monegasque swimming and a front of shops by the sea, in a district born on a peninsula reclaimed from the sea in the 1960s.

Three lives, one shore

The beach tells of three ages. That of the original development, when Monaco created the Larvotto peninsula and its seaside front: in 1968, the ceramist Roger Capron decorated the facades located under the promenade with twenty-nine marine panels.

That of the major renovation, presented to the press in 2019 and entrusted to the architect Renzo Piano as an aesthetic extension of the extension at sea. It will be completed at the beginning of 2022, after reopening to the public on July 3, 2021: larger beach, restructured promenade, wheelchair access, anti-jellyfish nets, and the return of “historic” shops and beachgoers.

That of today, that of the fight against erosion. The geotubes submerged in 2003 to retain the sand lasted twenty years. They give way to three islands of riprap, the installation of which will be completed in spring 2026 - a protection also designed to encourage colonization by marine species.

Continuous maintenance

Contrary to what the image of an unchanging beach suggests, the Larvotto is regularly resurfaced: reprofiling in spring 2024 from April 15 to May 3, then from March 31 to May 7, 2025, the swell having each time accentuated the slope during the winter. Swimming is then prohibited in the coves, but the beach remains accessible in sections and the seafront shops do not close.

Added to this are seasonal issues: weekly analyzes of bathing water, anti-jellyfish net from June 1st, “Monaco Zero Mégot” operation, seasonal surveillance. And the substantive issues: the lighting of the lower part of the promenade, requested by traders for several years, was only launched in November 2025 for commissioning in 2026, the architect’s agreement conditioning the slightest intervention.

Why we archive it

A beach is a place that everyone thinks they know and that no one documents: work follows one another, the morphology of the sand changes, the protection devices age, and the memory of these decisions is lost. Memoria preserves this chronology – dates, clients, sources – so that Larvotto is not just a setting, but a documented territory.

Each archive in this sheet is dated and linked to a public source. The facts are paraphrased; only titles, media, dates and links to publishers are included, with their mention. A document, a photograph, a correction? Write to Memoria.

The complete history, archive by archive

15 archives

2026

WorksMonaco Tribune — 7 octobre 2025 ; arrêté ministériel n° 2025-515· 30 April 2026

Last winter of construction on the shore

The dismantling of the geotubes and the installation of the three islands of riprap will be completed in spring 2026. Swimming remains prohibited in the Larvotto Reserve during the operations, the seafront shops remain open.

Read the cited source →

2025

RegulationJournal de Monaco — arrêté ministériel n° 2025-515 du 24 septembre 2025· 24 September 2025

A temporary zone prohibited for swimming in the Reserve

A ministerial decree establishes a temporary zone prohibited for swimming in the maritime area of the Larvotto Reserve, on the occasion of the removal of geotubes and the creation of a rocky island. The restriction is published in the Journal de Monaco.

Read the cited source →
ConstructionMonaco Tribune — 7 octobre 2025· 7 October 2025

Geotubes leave the bay

The coastal security project is entering its final chapter: the geotubes submerged since 2003 are gradually dismantled and replaced by three riprap structures, designed to encourage colonization by marine species.

Read the cited source →
MaintenanceMonaco Tribune — 1er mai 2025 ; Direction des Travaux Publics· 1 May 2025

Spring reprofiling, extended by swell

From March 31 to May 7, the beach is reprofiled to correct the steep slope during the winter. The weather and a strong swell prolong the work, carried out from 6 a.m. to 10 p.m.: swimming remains prohibited in the two coves, the beach remains accessible in sections.

Read the cited source →

2024

Practical informationMonaco Tribune — 15 mai 2024· 15 May 2024

Reopening of the beach and bathing season

After the reprofiling completed on May 3, swimming reopens and the 2024 season begins: weekly analyzes of bathing water displayed at the Larvotto police station, daily cleaning by the Société Monégasque d'Assainissement, anti-jellyfish net from June 1 and the “Monaco Zero Mégot” operation.

Read the cited source →
MaintenanceMonaco Tribune — 28 mars 2024· 28 March 2024

Three weeks of work to straighten the beach

The beach subsided during the winter, increasing the slope. From April 15 to May 3, a reprofiling restores a morphology adapted to the reception of the public and secures access to the swimming areas, with 120 meter retention nets protecting the underwater reserve from sediments.

Read the cited source →
HeritageNouveau Musée National de Monaco· 1 January 2024

The ceramics of Roger Capron reinstalled at the Salines

The twenty-nine enameled earthenware panels made in 1968 for the facades located under the Larvotto promenade, removed in 2019 for the work, are re-installed in the Galerie des Salines after a conservation-restoration project supervised by the NMNM.

Read the cited source →

2022

CompletionGouvernement Princier — 3 juillet 2021 ; Nice-Matin — 4 janvier 2026· 1 January 2022

End of renovation of the seaside resort

The renovation of the site will be completed at the beginning of 2022. There remains one black spot: the lower part of the promenade is not lit, and the architect's agreement is necessary for any intervention.

Read the cited source →

2021

InaugurationGouvernement Princier de Monaco — 3 juillet 2021· 3 July 2021

The Sovereign Prince inaugurates the new seaside complex

This Saturday, July 3, H.S.H. the Sovereign Prince officially inaugurates the new Larvotto seaside complex, in the presence of the Minister of State and Government Advisors-Ministers. The visit passes through Pierre Frolla's École Bleue, the crèche, the SeaWergie thalassothermal loop and the Handiplage site. The complex opens to the public at 12 p.m. the same day.

Read the cited source →
RenovationSources : presse locale et communiqués du Gouvernement Princier· 2 July 2021

The beach reinvented

End of seaside works: larger beach, restructured promenade, “historic” shops and beachgoers returning, wheelchair access, anti-jellyfish nets. The Larvotto is reborn after two years of construction.

Memoria archive — source cited above

2020

ConstructionSources publiques : programmation des travaux· 1 January 2020

Two years of construction for a new beach

Complete requalification of the water body and the seafront: Larvotto becomes the first beach in the Principality accessible to all.

Memoria archive — source cited above

2019

DevelopmentGouvernement Princier de Monaco ; Nouveau Musée National de Monaco· 1 November 2019

The seaside site redevelopment project is presented

The Prince's Government presents to the press the project to redevelop the Larvotto seaside site, entrusted to the architect Renzo Piano, as an aesthetic extension of the extension at sea. Roger Capron's ceramics are deposited to enable the work.

Read the cited source →

2003

WorksMonaco Tribune — 7 octobre 2025· 1 January 2003

Geotubes to retain sand

To contain the swell and stabilize the sand, the Principality immerses geotubes in front of the beach. The device will last around twenty years, until it is replaced by riprap from 2025.

Read the cited source →

1968

HeritageNouveau Musée National de Monaco· 1 January 1968

Roger Capron adorns the facades under the promenade

The ceramist Roger Capron creates an architectural decoration of twenty-nine enameled earthenware panels for the facades of the premises located under the Larvotto promenade: a marine theme of fish, algae and crustaceans, in reliefs and shades of pink and white, to adorn the walls of the new Principality beach.

Read the cited source →

1960

DevelopmentVisit Monaco — quartier du Larvotto· 1 January 1960

The Larvotto peninsula, first extension onto the sea

One of the first Monegasque extensions reclaimed from the sea creates the Larvotto peninsula and the seaside front of the district, along Avenue Princesse Grace.

Read the cited source →
Sources & press coverage

Sources cited in Plage du Larvotto's timeline

Memoria paraphrases facts from these publications and links to their publishers. Titles and links remain the property of their authors; no article content is reproduced.